ALL >> Service >> View Article
Leach Wallace Associates Inc Consulting Engineers: New Patient Tower Silver Spring
Leach Wallace was commissioned to design the expansion of the 300,000 sf New Patient Tower at Holy Cross, located in Silver Spring, Maryland. The expansion of the hospital included a 150 bed patient tower, including a new central energy plant and major renovation to the existing front lobby for circulation to the new tower. The major site renovations included a large expansion to the existing parking garage, new site utilities, underground fuel oil storage tanks, generators on grade, and site lighting.
A new central energy plant was provided to the penthouse of the new bed tower to service the entire campus. The new central energy plant included included a 3,000+ ton chiller plant with variable flow primary pumping systems and rooftop cooking tower yard, 50,000 lb/hr high pressure steam plant with new feed water systems. It also included central air handling systems with energy recovery, general and critical exhaust systems, domestic hot water plant, as well as main electrical distribution rooms, stair pressurization systems, central elevator machine room and smoke purge.
At the basement and ground level floor ...
... new central campus normal power distribution, emergency power distribution and paralleling gear room, central fire pump, domestic water booster pump, and steam-to-hot water heating plant. For energy recovery, a 750 ton heat pump chiller was provided, which will pre-cool the campus return chilled water returning to the central plant in the penthouse, and rejects its heat through condenser water to a loop in the heating hot water plant. All major air distribution was delivered to the floors as medium pressure, with air terminal units in the spaces to maintain individual zone loads.
The project was designed to achieve a “certified rating” from the USGBC. In addition, Green Guides for Healthcare (GGHC) Facilities document was utilized to identify a list of proposed sustainable features. This facility is seeking LEED Silver.
Add Comment
Service Articles
1. Early Puppy Training: Behaviors To Teach During The First 16 WeeksAuthor: BarkBusters SanMateo
2. Offset Color Printing In 2026: Why It Still Leads In High-end Packaging
Author: Alex Slate
3. Executive Recruitment Agencies: What To Look For When Hiring Senior Leadership Talent
Author: VirdisGroup
4. Garden Maintenance Aberdeen: Essential Tips For Keeping Your Outdoor Space Healthy And Tidy All Year Round
Author: Stephen Gowans
5. Why Epoxy Coating In Thane Isn't Just For Floors
Author: Weather Safeguard Waterproofing Services
6. How To Choose The Right Caterer For Your Event
Author: deepbuha01
7. Flooring Company Bromley: What To Look For When Choosing Professional Flooring Installers For Your Home
Author: GT Floors LTD
8. Aus Movers And Logistics – Complete Movers In Oman For Local & Global Moves
Author: Rukmini Bhanu
9. Asus Service Center Dubai: Need Expert Laptop Repair?
Author: Laptop Repair Services Dubai
10. 6 Emergency Situations When You Need A 24 Hour Locksmith Most
Author: Jasper Walker
11. Interior Design Services In Thane By Weather Safeguard Waterproofing Services
Author: Weather Safeguard Waterproofing Services
12. Why Homeowners Trust Appliance Repair Rye Ny Services
Author: The Appliance Doctor
13. Moving Out Without The Carpet Stress: Why Professional End Of Lease Carpet Cleaning Melbourne Matters
Author: Boost Carpet Cleaning Melbourne
14. Choose The Reliable And Best Mechanical Contractor Central Florida
Author: Con-Air Mechanical L.L.C
15. Hazardous Waste Containment Liners Us: What Landfill Operators Should Know
Author: Amcon Environmental






