Question: 1

How can material components be assigned to network activities?
Note: There are three (3) correct answers to this question.

A. By assigning them manually
B. Using the bill of materials transfer
C. Using assigned sales orders
D. Using ProMan
E. Using the Internet-based catalog

Answer: ABE

Question: 2

You want to confirm working hours to a WBS element using Cross Application Time Sheet (CATS). However, once you enter the WBS element and the working hours in CATS you receive an error message. What could be the reason?
Please choose the correct answer.

A. The system status created is active.
B. The system status master data locked is activate.
C. You are not the responsible person for that WBS element.
D. The confirmation exceeds the budget assigned to the WBS.

Answer: A

Question: 3

You want to extrapolate basic dates from lower to higher-level WBS elements. Which planning method do you choose?
Please choose the correct answer.

A. Bottom-up
...
... B. Strict bottom-up
C. Free planning
D. Top-down

Answer: A

Question: 4

You work with Project Builder (CJ20N) and want to use standard templates in your project structure. Which standard templates can you use?
Please choose the correct answer.

A. Standard time scheduling
B. Standard Bill of Material (BOM)
C. Standard cost planning
D. Standard Milestones

Answer: D

Question: 5

Your projects consist of WBS elements, several networks, and subnetworks. What are the advantages of new overall network scheduling (CN24N) instead of the old overall network scheduling (CN24)?
Note: There are three (3) correct answers to this question.

A. Scheduling of subnetworks and subordinate internal orders
B. Introduction of a configurable level concept for the targeted selection of subnetworks
C. Scheduling that takes available capacities and material availability into account
D. Improve performance through the targeted selection of subnetworks to be scheduled.
E. Detailed subnetwork monitor

Answer: BDE

Total Views: 444Word Count: 329See All articles From Author

Add Comment

Education Articles

1. Tested Tutor Reading Comprehension In Wellington: Enhancing Literacy Skills For Lifelong Learning
Author: khizar haider

2. Studyauracle
Author: Studyauracle

3. 10 Digital Marketing Tools You Must Use In 2025
Author: neetu

4. School Tutor Website In Palm Beach
Author: khizar haider

5. Studying Mbbs Abroad Is A Way To Successful Mbbs Career
Author: Mbbs Blog

6. Join Microsoft Dynamics 365 Courses – Online Training
Author: Pravin

7. Gcp Cloud Data Engineer Training | India
Author: naveen

8. Generative Ai For Devops Training Classes | Visualpath
Author: Visualpath

9. Best Az-305 | Azure Solutions Architect Expert Training
Author: gollakalyan

10. Tomorrow Starts With A Healthy Today
Author: Akshaya Patra

11. Gen Ai Training In Hyderabad | Best Generative Ai Training
Author: Susheel

12. Top Sap Ariba Training Institutes | Sap Ariba Training In Bangalore
Author: krishna

13. Safety & Health At Work - Qqi Level 5 Qualification
Author: johnnytorrt

14. School Tutor Website In Boynton Beach
Author: khizar haider

15. How To Become A Special Needs Tutor In Jacksonville
Author: khizar haider

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: