123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Education >> View Article

Hp0-s45 Preparation Kits

Profile Picture
By Author: HP0-S45 Preparation Material
Total Articles: 155
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

Question: 1

A customer has an HP ProLiant DL380 Gen9 server with one processor that has a large RAID 5 SAS Array configured on a P440ar storage controller with a hot spare. During the rebuild process, a second SAS drive failed.

What should the integrator do to help prevent this problem from reoccurring?

A. Configure a higher Rebuild.
B. Priority Install a second hot spare disk drive.
C. Install more memory in the server.
D. Use the integrated B140i controller.

Answer: D

Question: 2

A system integrator installed an operating system on an HP ProLiant Gen9 Server.
Which operating system can be used with UEFI Boot Mode?
A. VMware ESXi 5.5
B. Windows Server 2008 32-bit
C. Citrix XenServer 6.0
D. Windows Server 2003 64-bit


Answer: A

Question: 3

A customer with ProLiant Gen9 based servers needs to add external storage to some of the servers.
Which component should the integrator recommend?

A. 12GB SAS Expander Card
B. HP Smart Array P841
C. HP Smart Array P440ar
D. HP IO Accelerator

Answer: ...
... C

Question: 4

What is a benefit of using 20Gb FlexFabric Converged network adapter (CNA) for the BladeSystems?

A. It allows support tor RDMA over Converged Ethernet (RCOE) when the HP 6125XLG is used in conjunction with the FlexFabric adapter.
B. It delivers 10Gb performance per port with an aggregate 20Gb in a dual-port adapter.
C. The adapter streams converge 10GbE and 16Gb storage simultaneously over the same 20GD port.
D. Performance is delivered through multiple 2/10Gb ports using multiple adapters in a teamed fashion.


Answer: A

Question: 5

An integrator is installing an HP ProLiant DL380 Gen9 server with an H240ar controller installed. The integrator needs to install a total of 24 SFF Drives.

Which additional task must the integrator perform to meet the requirements?

A. Add an HP 12 GB SAS Expander Card cabled to the H240ar and cabled to two SFF backplanes.
B. Ada an SFF cable and an SFF backplane to the H240ar.
C. Add two more H240ar controllers with 8 SFF drives attached to each controller.
D. Add a rear drive cage backplane and cable it to the M240ar.

Answer: C

Total Views: 524Word Count: 320See All articles From Author

Add Comment

Education Articles

1. Data Science Course With Job Assistance: Building Skills For A Career In Ai
Author: BIA

2. Gemstone Wisdom: How To Understand, Choose And Wear Traditional Astrological Stones
Author: Narendra Sharma

3. How To Crack Neet 2027: Mock Tests, Previous Year Papers And Ai Practice
Author: Sarthaks eConnect

4. Mlops Online Course And Mlops Training In Ameerpet
Author: Subahan

5. Best Ai Product Management Training | Visualpath
Author: Visualpath

6. How Can Ai Turn Sap Data Into Business Insights
Author: golla kalyan

7. D365 Finance And Operations Training | D365 Training
Author: Hari

8. Forward Deployment Engineering Course | Visualpath
Author: Vamsi Ulavapati

9. Power Bi Training With Ai | Power Bi Classes Online
Author: Visualpath

10. Cissp Certification Guide 2026: Exam, Requirements, Training, And Preparation Strategy
Author: passyourcert net

11. Build Your Career With Practical Sap Training At Avina Technologies, Hyderabad
Author: Avina Technologies

12. Asphalt Calculator: Calculate Asphalt Quantity, Weight, And Cost Easily
Author: agecalculatot

13. How To Teach Young Children Who Can Not Read Junior Bible Quiz Questions
Author: JBQ Companion

14. Singapore Student Visa 2027: Complete Guide For Indian Students
Author: Nivesa EdTech

15. Sap Cloud Platform Integration Training | Sap Cloud Platform
Author: Visualpath

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: