ALL >> Education >> View Article
Hp0-s45 Preparation Kits
Question: 1
A customer has an HP ProLiant DL380 Gen9 server with one processor that has a large RAID 5 SAS Array configured on a P440ar storage controller with a hot spare. During the rebuild process, a second SAS drive failed.
What should the integrator do to help prevent this problem from reoccurring?
A. Configure a higher Rebuild.
B. Priority Install a second hot spare disk drive.
C. Install more memory in the server.
D. Use the integrated B140i controller.
Answer: D
Question: 2
A system integrator installed an operating system on an HP ProLiant Gen9 Server.
Which operating system can be used with UEFI Boot Mode?
A. VMware ESXi 5.5
B. Windows Server 2008 32-bit
C. Citrix XenServer 6.0
D. Windows Server 2003 64-bit
Answer: A
Question: 3
A customer with ProLiant Gen9 based servers needs to add external storage to some of the servers.
Which component should the integrator recommend?
A. 12GB SAS Expander Card
B. HP Smart Array P841
C. HP Smart Array P440ar
D. HP IO Accelerator
Answer: ...
... C
Question: 4
What is a benefit of using 20Gb FlexFabric Converged network adapter (CNA) for the BladeSystems?
A. It allows support tor RDMA over Converged Ethernet (RCOE) when the HP 6125XLG is used in conjunction with the FlexFabric adapter.
B. It delivers 10Gb performance per port with an aggregate 20Gb in a dual-port adapter.
C. The adapter streams converge 10GbE and 16Gb storage simultaneously over the same 20GD port.
D. Performance is delivered through multiple 2/10Gb ports using multiple adapters in a teamed fashion.
Answer: A
Question: 5
An integrator is installing an HP ProLiant DL380 Gen9 server with an H240ar controller installed. The integrator needs to install a total of 24 SFF Drives.
Which additional task must the integrator perform to meet the requirements?
A. Add an HP 12 GB SAS Expander Card cabled to the H240ar and cabled to two SFF backplanes.
B. Ada an SFF cable and an SFF backplane to the H240ar.
C. Add two more H240ar controllers with 8 SFF drives attached to each controller.
D. Add a rear drive cage backplane and cable it to the M240ar.
Answer: C
Add Comment
Education Articles
1. Top-rated Digital Marketing Institute With Industry-focused ModulesAuthor: Career Boss Institute
2. Elite Site Reliability Engineering Training – Boosting Sre Course
Author: krishna
3. Azure Data Engineer Course In Ameerpet | At Visualpath
Author: gollakalyan
4. Ai & Machine Learning Course | Ai Ml Online Courses
Author: Hari
5. How Delhi Career Group Makes Nda Coaching In Bhopal A Success Story For Defence Aspirants
Author: Delhi Career Group
6. Gcp Cloud Data Engineer Training | Gcp Data Engineer
Author: naveen
7. Learn Advanced Javascript Frameworks (react) - Web Design Course
Author: TCCI - Tririd Computer Coaching Institute
8. Data Analyst Courses Iskcon Cross Road, Ahmedabad - Best Computer Institute
Author: TCCI - Tririd Computer Coaching Institute
9. Best Ai Course With Live Project Training - Tcci Institute
Author: TCCI - Tririd Computer Coaching Institute
10. Jesus Faith Antennas: How To Strengthen Your Spiritual Connection
Author: Alex Costa
11. Building Future Innovators: The Role Of Stem Centres & Partnerships
Author: stem-xpert
12. Sap Ariba Course And Live Sap Ariba Online Training
Author: krishna
13. The Joy Of Giving: How Festivals Teach Children Empathy And Gratitude
Author: Harshad Valia
14. The Essential Guide To The Aws Certified Sysops Administrator – Associate Certification
Author: Passyourcert
15. Boost Your Iq Score: Fast Learner Techniques Anyone Can Use
Author: Boost Your IQ Score: Fast Learner Techniques Anyon






