123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Education >> View Article

Hp0-s45 Preparation Kits

Profile Picture
By Author: HP0-S45 Preparation Material
Total Articles: 155
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

Question: 1

A customer has an HP ProLiant DL380 Gen9 server with one processor that has a large RAID 5 SAS Array configured on a P440ar storage controller with a hot spare. During the rebuild process, a second SAS drive failed.

What should the integrator do to help prevent this problem from reoccurring?

A. Configure a higher Rebuild.
B. Priority Install a second hot spare disk drive.
C. Install more memory in the server.
D. Use the integrated B140i controller.

Answer: D

Question: 2

A system integrator installed an operating system on an HP ProLiant Gen9 Server.
Which operating system can be used with UEFI Boot Mode?
A. VMware ESXi 5.5
B. Windows Server 2008 32-bit
C. Citrix XenServer 6.0
D. Windows Server 2003 64-bit


Answer: A

Question: 3

A customer with ProLiant Gen9 based servers needs to add external storage to some of the servers.
Which component should the integrator recommend?

A. 12GB SAS Expander Card
B. HP Smart Array P841
C. HP Smart Array P440ar
D. HP IO Accelerator

Answer: ...
... C

Question: 4

What is a benefit of using 20Gb FlexFabric Converged network adapter (CNA) for the BladeSystems?

A. It allows support tor RDMA over Converged Ethernet (RCOE) when the HP 6125XLG is used in conjunction with the FlexFabric adapter.
B. It delivers 10Gb performance per port with an aggregate 20Gb in a dual-port adapter.
C. The adapter streams converge 10GbE and 16Gb storage simultaneously over the same 20GD port.
D. Performance is delivered through multiple 2/10Gb ports using multiple adapters in a teamed fashion.


Answer: A

Question: 5

An integrator is installing an HP ProLiant DL380 Gen9 server with an H240ar controller installed. The integrator needs to install a total of 24 SFF Drives.

Which additional task must the integrator perform to meet the requirements?

A. Add an HP 12 GB SAS Expander Card cabled to the H240ar and cabled to two SFF backplanes.
B. Ada an SFF cable and an SFF backplane to the H240ar.
C. Add two more H240ar controllers with 8 SFF drives attached to each controller.
D. Add a rear drive cage backplane and cable it to the M240ar.

Answer: C

Total Views: 497Word Count: 320See All articles From Author

Add Comment

Education Articles

1. The Ultimate Cambridge & Aqa Academic Suite
Author: Josphene

2. Hypnoseausbildung Hannover
Author: Winfried Wengenroth

3. Top Factors To Consider Before Selecting A Wbcs Coaching Centre In Kolkata
Author: Sreeli

4. Agentic Ai Online Course | Practical Ai Training By Visualpath
Author: Hari

5. Oracle Fusion Cloud Technical Training | Oracle Fusion Technical Course
Author: Visualpath

6. Cosmetic Smile Design In Chennai – Creating A Confident And Natural Smile
Author: MAHESH

7. Ielts Reading Test Guide 2026: Format, Tips, Question Types & Preparation Strategies
Author: Nivesa EdTech

8. Ai Engineering Training | Ai Engineering Online Course
Author: visualpath

9. Sap Ai Training In India With Expert Trainer Support
Author: gollakalyan

10. Matlab Simulink Course | Expert Matlab Programming
Author: Subahan

11. Why Solve Gmat Pyqs And Sample Papers 2026 Before The Exam?
Author: Ramesh

12. Sap Cpi Training Online | Sap Cpi Online Training
Author: Visualpath

13. Sap Ui5 Fiori Course | Sap Ui5 Fiori Online Training
Author: naveen

14. Hair Growth Clinic In Anna Nagar – Professional Solutions For Healthier Hair
Author: ivar

15. Hyperpigmentation Treatment In Anna Nagar – Effective Solutions For Even-toned Skin
Author: ivar

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: