123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Business >> View Article

Uid Data Verification And Submission To Uid Registry

Profile Picture
By Author: ID Integration
Total Articles: 272
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

The US Department of Defense introduced the system of submitting the UID data of the items to UID registry during November 2004. UID registry is the storehouse of information about the DoD items and their UID data. The submission to UID registry is important as it enhances the maintenance of data and helps the DoD personnel to keep track of the items easily. In other words, the system of submitting data to the UID Registry enhances the item tracking process across the department of Defense. The records that are stored can be accessed for further use as they contain data such as acquisition or manufacture of the items, their maintenance date or process, repairing information etc. Hence, looking at the significance of the UID data in the DoD, the department has mandated that the UID data entered to the UID registry should comply with the MIL-STD-130 standard.

Submission to the UID Registry is crucial for the item management process of the DoD and it is also essential that the data are correctly entered. Part number, enterprise code, serial number of the item, issuing agency code, construct type (construct #1 or Construct ...
... #2), etc. are the basic data required for the submission so as to maintain a balance between different types of data. The UID data required on the items are machine readable 2D data matrix codes and human readable UID data. And it is required that both kind of data should be submitted to the UID Registry.

There are certain aspects of submitting data and the contractors are required to follow them so as to get accepted. Although the data should be entered in the XML format, there are other aspects to be considered.

UID Registry Schema Review
It has been stated that the data format should be converted into XML format before making their way to UID Registry. However, it is crucial that the external files of the property management database are modified according to the UID registry schema anf requirements before the files are converted to XML formats. Basing on the GFP, the versions of the schema have been continuously changing and the latest version that is being used for the UID Registry is the 3.0.

Data Format Adjustment for the Submission
The UID Registry maintenance team has prepared a data format for the submission process and the contractors are required to modify their format according to the standard. Depending on the products and details that are required to be submitted, the formats of the data are modified. If required, the formats are changed even after changing them to XML format.

UID Test Registry- The Testing Solution
Before making it to the UID Registry the UID data are submitted to the UID test Registry for verification. The UID production approves the data and sends it to the GEX certified VAN provider. GEX certified VAN provider ensures that the data are submitted to the UID registry's FTP services.

It is important that the submitted data are approved by the UID Registry. However, the approval or rejection is mentioned through the website of UID Registry.

ID-integration.com provides complete solutions for UID and UID Registry related needs. ID-integration.com also provides complete solutions to meet new DoD direct part marking requirements.

Total Views: 284Word Count: 536See All articles From Author

Add Comment

Business Articles

1. Acoustics, Or The Study Of Sound
Author: DSP Consultants

2. Famous Music Festivals In Western Canada: Where Sound And Scenery Collide
Author: Miles James

3. Popular Music Festivals In Western Canada: Where Sound Meets Scenery
Author: Miles James

4. Music Festivals British Columbia: Experience The Soundtrack Of British Columbia
Author: Miles James

5. Shine Your Brand Bright: Hire Led Advertising Screens And Mobile Led Vans In Birmingham
Author: Vikram kumar

6. Affordable Digital Marketing Company In Visakhapatnam For Startups And Small Businesses
Author: Digital Shout

7. Modern Balcony Railing Design And Designer Fencing Work In Hyderabad For Elegant Homes
Author: MA Fabrication

8. Enhance Safety And Style With Balcony Grill With Pigeon Protection In Hyderabad
Author: MA Fabrication

9. Turning Waste Into Worth – How Kerone Is Harnessing Biochar For Sustainability
Author: Shivam Chaurasia

10. The Importance Of The Modern Security Audit Services
Author: Qadit

11. Exploring Information Security Management In Bangalore: Protecting Digital Assets In India’s Hotspot For Technology
Author: Qadit

12. Booking Back Office
Author: Anusha Raj

13. Implementing Iso 17025 Requirements In Your Lab Operations
Author: Sarah

14. Lucintel Forecasts The Global Education Erp Market To Grow With A Cagr Of 14.2% From 2024 To 2030
Author: Lucintel LLC

15. Why Quality Matters In Paper Cutting Knife And Blades For Industrial Applications
Author: Perfect Knives

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: