123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Business >> View Article

Solar Hot Water Incentive In Massachusettes

Profile Picture
By Author: Tai Roylance
Total Articles: 300
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

The Solar Beam Concentrator is a solar hot water system that provides up to 12kWh of solar hot water. Since the system tracks the sun, it is more efficient than flat panels. The Solar Beam can be used in any application that requires solar hot water or solar heat.
Currently the Massachusetts government is paying commercial applications for solar heat. You can make a lot of money using Solar Beam for providing solar heat because it produces 12kWh from one system. You would need at least 15 flat panels to provide the same amount of solar heat. In Massachusetts you can get up to $50,000 rebate for solar hot water.
The Solar Beam is a powerful solar water system that can produce more solar heat per m2 than flat panels or evacuated tubes. For example, if you had to heat 10,000 gallons of hot water to 150 F in 6 hours, 36 Solar Beams are required, compared to 468 flat panels ( typically 1 Solar Beam to 15 flat panels: based on type of flat panel and application type)
Since the Solar Beam can be installed on the ground or the roof. There is greater flexibility than flat panels or evacuated tubes that have to be installed ...
... on the roof. Also, rarely is there space to install 468 flat panels on the roof or on the ground (if the space is available)
When it comes to spacing of the Solar Beams, generally you can allow 20 feet apart for installation. This is dependant on your location and the layout for the Solar Beams.
Solar hot water scheme in Massachusetts
The Commonwealth Solar Hot Water Program offers funding for solar hot water (“SHW”) systems at residential, commercial, industrial, institutional, and public facilities. The program offers grants for SHW feasibility studies and construction projects. The information below pertains to feasibility studies for commercial-scale solar hot water projects.
The goal of the MassCEC funded Feasibility Studies is to help building owners1 assess the potential benefits of installing a solar hot water system. Feasibility Study grants will be awarded to building applicants who have procured an experienced consultant to submit the Feasibility Study Grant Application to the MassCEC and conduct the Feasibility Study on their behalf. MassCEC requires a site visit and a comprehensive report assessing the design considerations specified in the Feasibility Study Scope of Work, including, but not limited to, analysis of the site, the roof structure, the hot water load (to be measured through metering), and project economics.
1:A Feasibility Study is a prerequisite for all commercial-scale projects applying for a Commonwealth Solar Hot Water Construction Rebate. The Feasibility Study does not have to be funded by MassCEC to qualify. Building Owners may choose to complete a non-MassCEC funded Feasibility Study and apply to the MassCEC for a Construction Rebate only.
Available Funding:
The first year of the Commonwealth Solar Hot Water Program will run from July 2012 through June 2013. The total program budget is $1.5 million, with approximately $1.35 million available for construction rebates and commercial feasibility studies. The funding will be expended on a “first come, first served” basis. The total funding available for Feasibility Study grants is $250,000. The maximum Feasibility Study grant is $5,000. All applicants are required to provide a cost share:
• Public Entities must demonstrate a cost share of 5% of the total feasibility study costs.
• Non-Public Entities must demonstrate a cost share of 25% of the total feasibility study cost.
For purposes of satisfying the Cost Share requirement, the Grantee may provide evidence of: payments to subcontractors/consultants, direct materials and/or costs.
Eligibility
To be eligible for a Commonwealth Solar Hot Water Program Feasibility Study grant, systems must serve entities that are located in an electric utility territory that contributes to MassCEC’s Renewable Energy Trust Fund, which includes customers served by National Grid, NSTAR, Unitil (Fitchburg Gas and Electric), WMECO or a participating Municipal Light Plant community. MassCEC will require applicants to submit a copy of their electric bill so that MassCEC can verify that the customer pays into the Renewable Energy Trust Fund. Projects may be for new construction or existing buildings.
Feasibility Study grants will not be awarded to proposed systems that would offset natural gas heating systems. However, building owners with natural gas heating systems may apply for construction funding. Systems heated by electricity, oil, propane, etc., are eligible for both Feasibility Study funds and Construction funding. Buildings used seasonally are not eligible for funding. The building must be occupied for more than 9 months a year and must be occupied during the summer months.
Here the author tairoylance says a. solar water for more information, please http://www.solartronenergy.com/

Total Views: 304Word Count: 769See All articles From Author

Add Comment

Business Articles

1. Acoustics, Or The Study Of Sound
Author: DSP Consultants

2. Famous Music Festivals In Western Canada: Where Sound And Scenery Collide
Author: Miles James

3. Popular Music Festivals In Western Canada: Where Sound Meets Scenery
Author: Miles James

4. Music Festivals British Columbia: Experience The Soundtrack Of British Columbia
Author: Miles James

5. Shine Your Brand Bright: Hire Led Advertising Screens And Mobile Led Vans In Birmingham
Author: Vikram kumar

6. Affordable Digital Marketing Company In Visakhapatnam For Startups And Small Businesses
Author: Digital Shout

7. Modern Balcony Railing Design And Designer Fencing Work In Hyderabad For Elegant Homes
Author: MA Fabrication

8. Enhance Safety And Style With Balcony Grill With Pigeon Protection In Hyderabad
Author: MA Fabrication

9. Turning Waste Into Worth – How Kerone Is Harnessing Biochar For Sustainability
Author: Shivam Chaurasia

10. The Importance Of The Modern Security Audit Services
Author: Qadit

11. Exploring Information Security Management In Bangalore: Protecting Digital Assets In India’s Hotspot For Technology
Author: Qadit

12. Booking Back Office
Author: Anusha Raj

13. Implementing Iso 17025 Requirements In Your Lab Operations
Author: Sarah

14. Lucintel Forecasts The Global Education Erp Market To Grow With A Cagr Of 14.2% From 2024 To 2030
Author: Lucintel LLC

15. Why Quality Matters In Paper Cutting Knife And Blades For Industrial Applications
Author: Perfect Knives

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: