ALL >> Home-and-Garden >> View Article
Installin A Wood Floor Using Adhesive

Installing Wood Flooring Using Adhesive
Mostsolid and engineered floors can be {{{fitted| installed| laid using wood flooring adhesive. . There are two main techniques for installing using adhesive which will both be explained. Please remember that solid floors are always recommended to be glued down, not using the floating method.
Floating Floor Method
The floating floor method of fixing the wooden floor is done by gluing the tongues and grooves of the floor together. This creates a new floor which is �floating� over the original floor. Engineered floors can be floated over any solid sub floor and it is the preferred method for laying engineered floors.
{{{An advantage with the floating method is | It is a good option when the sub floor moisture content is unknown| because a damp proof membrane can be used between the floor and subfloor to prevent moisture rising into the new flooring. When floating a floor, an underlay must be used to reduceany echo and also provide a leveling effect to the sub-floor
This echo is caused by the two hard surfaces together which have ...
... a space between them. The noise echoes in this void. The underlay is used to prevent any echo as the two hard surfaces will not be in contact with each other. The choice of underlay is huge for use when floating the floor � all of which are adequate. A good quality underlay is advised as this ensures there is less sound echo from foot traffic. Generally the more dense an underlay the less noise!
To float the floor:
Lay a plastic or foil moisure barrier ensuring that the edges of the membrane continue up the side of the skirting. and overlap the seams by 100mm Lay out the underlay ensuring all areas of the floor are covered. Any areas left uncovered with the underlay will cause a bounce in the new floor and will be noisier. A PVA adhesive is used to glue the boards together.
Fit the floor by placing two beads of adhesive along the upper and lower sides of the �groove� joint. (It is a common mistake to think that the boards need to be glued along the �tongue� � this will simply push the adhesive too far into the joint and not create a firm bond between the boards.) down the complete length of the boardas this can cause the boards to creak if the joint is not constant.
Allow 12 hours for the PVA to cure before walking over the floor. Any glue residue which has spilled or oozed onto the boards can easily be wiped off a lacquered or oiled board, or sanded off an unfinished floor. It must be noted that thermo treated solid oak has less density therefore water based pva will not adhere to the timber as well as normal oak.
The Glue Down Method
The glue down method of fitting a floor consists of using a wood floor adhesive, trowelled onto the sub-floor such as F Ball B92 enabling the new floor to stick directly to the original floor. This is a very strong way which is the recommended option for most solid wood and parquet floors.
To fit a floor using the glue down method you must first ensure that the sub-floor is dry, level and structurally sound. When {{{installing| laying| fitting onto concrete it is best to prime the area first using a PVA based primer to ensure a good bond to the floor. Old concrete is recommended to be checked for moisture and or contamination before the boards are laid. Both engineered flooring and solid flooring can be laid using the glue down method.
Installing:
({{Fist and foremeost, |Firstly,| The first thing to do is}}} ensure the sub-floor is in a satisfactory condition (see above) Working in an area just large enough to complete within 30 minutes, apply the adhesive to the sub-floor using a trowek with the specified notch size ensuring the whole sub-floor area has an even amount of glue.Lay the new floor boards ensuring all boards have been pulled tight and have not been moved out of place as other boards have been fitted. It may be advisable to clamp up any slightly bent boards at this stage.
Leave the adhesive toharden for 12 hours and do not walk on the floor until it is fully set. Unlike PVA adhesive, flooring adhesive is very {{{hard| difficult}} to remove from the surface of the boards. Ensure that any spills on the boards are wiped off immediately before the boards have dried.
Other Adhesive based fitting methods:
The are other adhesive based fitting options used to fit flooring:
1. Adhesive backed underlay. The underlay has a sticky side covered in a plastic film which is peeled back as the floor is laid. Envoy multi, Elastilon and Acoustalay adhesive 300/1000 are all types of adhesive backed underlay.
2. Slatted Underlay for use with adhesive. This underlay comes with narrow slats cut out � this enables the underlay to be used in conjunction with adhesive as the glue is applied in the cut-outs. The floor benefits from being glued down directly with the added advantage of having an underlay in between. This option is used when the floor is to be glued down directly but the sub floor is not completely flat.
Precautions
It is imperative that wood is given adequate chance to acclimatize before being bonded to the sub-floor. Allow at least two weeks for a solid wood floor and 48 hours for an engineered wood floor.
Take a thorough moisture check of the sub- floor for latent or rising damp. If in any doubt an application of an epoxy resin damp screen is advised.
David is the owner of Birbek Wood Floors. Birbek is a UK distributor of european oak and specialises in design parquet flooring, and specialises in herringbone and design parquet wood floor tiles. http://www.birbek.com
Add Comment
Home and Garden Articles
1. 3m Window Film: Enhancing Home Comfort, Safety, And Energy EfficiencyAuthor: Home Window Tinting Austin
2. Frameless Vs Framed Bathroom Mirrors: What’s Trending In Kolkata Homes?
Author: genxbathware
3. Ensure Damage Damage-free Home With Waterproofing Solutions
Author: Christian Zox
4. 5 Different Tips To Find A Good Concreter- An Overview
Author: Christian Zox
5. The Environmental Impact Of Junk Removal: How Professionals Make A Difference
Author: Onyx Braun
6. Why Should You Prefer Hiring Professionals For Gutter Cleaning?
Author: Ashton Coaldrake
7. Understanding The Benefits Of A Chain Mesh Fencing System- An Overview
Author: Michael Gilmore
8. How The Commercial Shed Can Solve Your Product Storage Problem?
Author: Michael Gilmore
9. Be Ready With Planning Permission Before Renovating Your Property
Author: Garry Stacks
10. The Two Fundamental Reasons For Custom House Extensions
Author: Charlotte Anderson
11. Bathroom Renovation Requires Proper Planning And Execution For Successful Results
Author: Charlotte Anderson
12. Why You Should Not Compromise With The Security System Measures Of Your Office?
Author: Owen Summerville
13. Add Aesthetic Appeal To Your House With Tree Removal Services
Author: Noah Dransfield
14. How Much Does It Cost To Install Porcelain Tile In A 3000 Sq Ft House?
Author: Estimate Florida Consulting
15. Calculating Your Roi: Why Switching To Jpm Led Lights Saves You Money
Author: jpm industries