Moving On Up, While Keeping Cost Down For Office Cubicles!

Profile Picture
By Author: Larry Tang
Total Articles: 512
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

When Monarch Health out grew its existing space in Technology Park in Irvine California it decided to lease an additional 24,000 square feet in the same development. "We didn't want to risk loosing any employees with the move and the Park's central location with the proximity to Interstates 5 and 405 has worked well for us," according to Tom Wilshart, Office Administrator for Monarch Health.

"My years of experience have taught me that moving a company can be very disruptive and we wanted to do everything possible to minimize the disruptions for the company and our employees. It can also be very costly, especially with the rising cost of real estate and construction in Southern California, so staying within a strict budget was also important."

"The project was competitively bid and MAiSPACE won the business hands down as the furniture supplier. Their MORspace frame and tile system offered the features we wanted for about the same price as the other lower quality monolithic systems. I'm able to report that our employees are very happy in their new digs."

The Monarch project consists of 65 workstations and ...
... 24 private offices. Monarch selected Coverseal, a proprietary MAiSPACE material in a warm grey color for their worksurfaces a sand colored crepe fabric, interspersed with some clear glass for the panel segments. Cabinets and trim are khaki.

Another feature contributing to the fast installation is the MAiSPACE modular cabling system. The pre-wired cables were installed by the furniture installers inside the frames at the time of installation and conveniently left at the appropriate entry location for the cable installers. It was then a simple task to do the punch downs at the end of the runs after the furniture installation was complete saving both time and money.

"The bottom line," summarizes Tom Wilshart, "the total cost to furnish our facility was only $12 per square foot installed. And we area able to move in just five weeks after we placed the order."

Total Views: 342Word Count: 323See All articles From Author

Add Comment

Environment Articles

1. What Is A Reverse Cycle Air Conditioner? A Complete Guide For Australian Homes
Author: Saving Energy Team

2. Landfill Tarp Suppliers Us: A Full Guide For Buyers
Author: Amcon Environmental

3. Solar Panels Clyde North – The Complete Home Solar Guide By Electrical Masters
Author: ELECTRICALMASTERS

4. How To Top Up Your Wechat Wallet From Overseas
Author: payenjoynow

5. Discover The Perfect Staycation At Boxtel Lonavla : A Blend Of Comfort, Community, And Scenic Escape
Author: Boxtel Lonavla

6. Why Environmental Audits Are Essential For Sustainable And Compliant Businesses
Author: Elion Technologies and Consulting

7. Why Installing A Solar Panel In Tamil Nadu Is The Smartest Investment For 2026
Author: EmmaCollins

8. Khelostar: Where Every Moment Becomes A Turning Point
Author: Anand

9. Khelostar: Where Rivalry Sparks Unstoppable Passion
Author: Anand

10. Winmatch — A Place Where Modern Design Feels Natural
Author: Anand

11. Leadership Development: Team Building Activities That Empower Leaders
Author: Aisha

12. Biofertilizers- Powering The Next Green Revolution In Sustainable Agriculture
Author: Satyajit Shinde

13. What Is Driving The Rising Demand In The Benzoic Acid Market?
Author: komal

14. Cleaner, Safer Kitchen Waste With Pfas Free, Methane-free Compostable
Author: Biotuff

15. When Does Daylight Savings End In Nsw? (2025 Guide)
Author: Javeria Shafique

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: