An Organization's Duration Estimating Database
AN ORGANIZATION’S DURATION ESTIMATING DATABASE is the best reference information to use for estimating activity duration when activity durations are not driven by the actual work content. Organizations involved in the project may maintain duration estimating databases and other historical reference data that can be useful in estimating activity durations.
Assumptions and constraints from the project scope statement are considered when estimating activity duration schedules. PMP preparation reviews assumptions and constraints.
An example of an assumption is the length of the project reporting periods, which can dictate maximum scheduled activity duration.
An example of a constraint on schedule activity durations would be document submittals, reviews, and similar non-deliverable schedule activities, which have frequencies and durations either specified by contract, or within the performing organization's policies.
INEFFICIENCY caused by lack of adequate quantities or skills or materials, equipment, and labor/personnel, will significantly influence the duration of most activities. PMP prep courses ...
... include examples of inefficiencies.
THE RESOURCE CALENDAR developed as part of the activity resource estimating process includes:
Availability and capabilities skills of human resources
Availability and capability of equipment and material resources
THE RISK REGISTER has information on identified project risks. These risks must be considered when producing estimates of activity durations, or when activity durations for risks must be adjusted.
COMPLETED ACTIVITY COST ESTIMATES can be developed to provide estimated resource quantities for each schedule activity in the project activity list.
RESOURCE QUANTITY and PRODUCTIVITY RATE
THREE-POINT ESTIMATES are activity duration estimates that consider the amount of relative risk involved in the original estimate. Three-point estimates are based on estimates that might be:
The most likely
Optimistic (best-case scenario)
Pessimistic (worst-case scenario)
Using a combined average of the three types of estimates provides a more accurate activity duration estimate than a single-point estimate.
Project teams can choose to incorporate additional time into the project schedule.
These additions are referred to as:
Buffers
Contingencies
Reserves
Time Reserves (amounts of time added to the schedule to compensate for recognized schedule risk).
THE CONTINGENCY RESERVE may be a percentage of estimated activity duration, a fixed number of work periods, or may be developed by quantitative schedule risk analysis.
Develop the project schedule—Develop Schedule:
SCHEDULING is essentially the converting of the project action plan into a functioning timetable which provides the basis for monitoring and controlling the project.
Not all project activities need to be scheduled in the same level of detail.
Kimberly Bloch, To Get the proper PMP Exam Preparation training to pass the pmp exam certification exam with flying colors. Visit the site- pmeducate.com, too for some useful hints on Project Management PMP.
Add Comment
Education Articles
1. How Mock Tests Help Students Prepare More Effectively For NeetAuthor: Sarthaks eConnect
2. How Indian Students Can Avoid Singapore Student Visa Rejection In 2026
Author: Nivesa EdTech
3. Ai Stack Course In Hyderabad | Ai Stack Training In Ameerpet
Author: Hari
4. The Celestial Rhythm: Understanding Mawaqit Al-salat (islamic Prayer Times)
Author: Sophia Eddi
5. The Rising Importance Of Data Science Skills In Ahmedabad’s Emerging It Landscape
Author: Arun
6. Ai Product Management | Ai Product Management Training Course
Author: Visualpath
7. Ai & Coding Training For Std 7 To 10 - Building Future Innovators With Smart Learning - Evision Technoserve
Author: Evision Technoserve
8. Proqual Level 7 Nvq: Elevate Your Safety Career Today
Author: Gulf Academy Safety
9. Join Sap Cpi Training In Hyderabad And Build Cpi Skills
Author: Pravin
10. Dryer Duct Booster Fan In Queens County: The Secret To Faster Drying And Better Home Safety
Author: cleanairrepair1
11. Synopsys To Hold Annual User Group Conference On June 18 In Bengaluru
Author: Madhulina
12. Best Areas In Pune For Students Learning Tech Courses 2026
Author: Fusionsoftwareinstitute
13. Pmi-pba Certification: The Ultimate Path To Becoming A High-impact Business Analysis Professional
Author: NYTCC
14. Capm Certification: Your First Step Toward A Successful Project Management Career
Author: Passyourcert
15. How To Start A Nursing Career From Scratch: A Complete Beginner's Guide
Author: Richard