Monitor Industrial 36 Inch Pitless Unit Installation

Profile Picture
By Author: Baker Water Systems
Total Articles: 1
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

A quality installation of a monitor pitless unit can be made easily and economically, creating a sound cost-saving solution.

For the purposes of this video, we will be using a 36-inch diameter custom industrial pitless unit. Before beginning installation, establish the ground level at the well location. The pitless units upper casing should extend above ground level, according to state well code. Excavate around the existing well casing, according to state and local codes, to determine where the casing is to be cut. This is typically 2-3 feet below the bury depth. It is very important to understand the soil type and utilize a protective system.

This video shows a trench box in place to prevent cave-ins.

- Find the well casing's plumb deviation and mark the spots using a level.

- Measure and chalk a line to mark the appropriate location to cut or torch the well casing. Be sure the well casing is supported when cutting the casing.

- Cut the well casing perpendicular to the well casing center line. Now remove the pitless unit cap loosen the hold-down hooks and remove the spool assembly. Position ...
... well tabs on the existing well casing to help align and support the pitless unit. Position the pitless unit over the cut off well casing and rotate the discharge body to align with the existing lateral water line. Next, tack-weld the pitless unit to the well casing at the two plum marks and tilt the pitless unit until its deviation from plumb equals the casing deviation. This procedure is necessary to ensure the spool properly seals inside the discharge body. By skipping this step, the drop pipe may bend, creating additional stress on the spool assembly and preventing it from sealing properly.

- After the unit is completely secure to the well casing, pressure test the pitless unit to ensure no leaks are present.

- Connect the discharge outlet to the distribution line.

- The pitless unit is now ready for partial backfill.

Be sure steps are taken to properly fill under the discharge line to minimize ground settling. Next, install the conduit for the electrical wires.

You are now ready to set the submersible pump. A waterproof splice is required on all motor leads.

Be sure to refer to the installation instructions of the motor manufacturer for proper splicing techniques. You can now attach the submersible pump to the drop pipe.

Be sure to rotate motor shaft to properly align with the coupling splines. Once aligned, evenly torque bolts in a criss-crossing pattern and secure in place. This installation incorporates a flow sleeve to increase the water velocity past the motor. The flow sleeve was required in this application due to the large 36-inch diameter well casing. Depending on your pump set, you may require multiple check valves. Check valves are recommended every 200 feet. Precautions should be taken to prevent damage to the electrical wires when passing check valves. A protective shield is recommended to prevent the wire insulation from scraping on the inside diameter of the well casing. Continue to couple lengths of pipe until you reach the proper depth of your well. The last section of pipe will connect directly to the bottom of the spools drop pipe connection. Once the final drop connection is tight, wipe down the rubber O-ring seals with a clean cloth and add a generous layer of petroleum jelly. The spool provides openings to allow electrical wires, probe tube, and air test line to pass through. Once complete, lower the spool assembly. An air test line and pressure transducer may be required. Both function as a method to measure the water level within your well.

If a pressure transducer is required, a probe tube or conduit will allow for a simpler installation. Once seated, tighten hold-down hooks to prevent rotation. After completing the final electrical connections, you may install the cap. Congratulations on completing the installation of your monitor industrial pitless unit. For reliability, superior construction, and overall maintenance-free use, trust in Baker Water Systems for all your water needs. For more information on this and other products, visit our website at www. Bakerwatersystems.com.

More About the Author

Baker Water Systems is a trusted name in the water systems industry, proudly serving a wide range of markets including residential, agricultural, industrial, municipal, environmental, and commercial sectors. With a legacy of innovation and quality, we specialize in solutions that move, treat, store, and deliver water reliably and efficiently.

Total Views: 0Word Count: 678See All articles From Author

Add Comment

Education Articles

1. Top Clat Coaching In Kolkata: Key Factors That Help Students Achieve Higher Scores
Author: Amrita

2. A Complete Guide To Finding The Best Cbse School In Howrah District For Quality Education
Author: Siya

3. How Can Aigp Certification Training Help Ai Governance Careers In The Usa, Uae, And India?
Author: Passyourcert

4. Sap Artificial Intelligence Training With Practical Work
Author: gollakalyan

5. Nebosh Igc Course Details To Kickstart Your Hse Journey
Author: Gulf Academy Safety

6. Site Reliability Engineering Training | Sre Course Online
Author: Vamsi Ulavapati

7. Azure Data Engineer Course In Bangalore | Azure Data Engineer
Author: naveen

8. Bhopal's Growing Digital Economy And The Need For Data Analytics Skills
Author: Vaishnavi

9. Mayadhar Higher Secondary School – Helping Students Aim For Neet Success In Odisha
Author: Mayadhar School

10. Isep Skills For Managers: Building Sustainable Leaders
Author: Gulf Academy Safety

11. Ai Agent Development Training | Ai Agents With Copilot
Author: Visualpath

12. Rcdd Certification: Exam, Cost, Training, And Career Benefits
Author: Passyourcert

13. Cia Challenge Certification: Your Complete Guide To Eligibility, Exam Preparation, Fees, And Success
Author: Passyourcert

14. How Engineering Assignment Help Uk Reduces Academic Stress
Author: Grace jones

15. A Complete Guide To Finding The Best Clat Coaching In Kolkata For Law Entrance Preparation
Author: Amrita

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: