123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Business >> View Article

Traffic Simulation And Analysis

Profile Picture
By Author: Mitesh Patel
Total Articles: 24
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

The performance of an elevator is directly related to lift simulation analysis to the population of the building, and the “arrival rate”; which is the percentage of the population arriving in the lobby to take the lift, in a time frame of 5 minutes (5AR). The other part of the equation is the capacity of the elevator system – i.e. how many passengers the elevator is able to transport from the lobby, within a certain time frame. This criterion is known as the “handling capacity”, which is also defined as a percentage of population in 5 minutes (5HC). With a well-designed lift system, the Arrival Rate and Handling Capacity are in balance during the most busy time of day (typically morning-peak or lunch-peak). However, when the Arrival Rate is higher than the Handling Capacity, the lift car will get full and some passengers will need to wait the next lift. This means that the system will saturate, and waits will increase exponentially. Similarly, when the arrival rate is significantly lower than the handling capacity, the system is overdesigned – at the expense of high costs (too many lifts) and a lift design efficiency ...
... (building core too large, too many lift shafts). The most important indicators of ‘quality of service’ in Elevators are:

1. Average Waiting Time (AWT); the average of all passenger who are using the elevator, departing from any floor in the building.
2. Average Time To Destination (ATTD); the time it takes from the moment of arriving in the lobby until reaching the destination floor.
3. Average Car Load Factor (ACLF); the average fill rate of the lift car
The above performance indicators can only be determined through a Traffic
Simulation. Elevator Traffic Analysis is typically required during design stage of a new building, during a lift modernization project, and in case of traffic complaints (long waits and full cars) with existing buildings. Designing and dimensioning elevators is a careful balance between Space, Performance and Costs.

More About the Author

AdSimulo is industry's first revolutionary lift traffic analysis and simulation application for architects, engineers and consultants. Know more https://adsimulo.com/

Total Views: 125Word Count: 322See All articles From Author

Add Comment

Business Articles

1. Repair And Maintenance Guide For Garden Fencing
Author: Vikram kumar

2. Lucintel Forecasts The Global Palatant Market To Grow With A Cagr Of 5% From 2024 To 2030
Author: Lucintel LLC

3. Choosing The Right Gas Regulator In Florida: A Complete Guide
Author: Technico

4. Why Deer Park Learners Trust Local Driving Instructors
Author: Aintree Driving School

5. How To Properly Install And Uninstall Your Air Conditioner System With A Low Budget
Author: Neha Jain

6. What Is The Role Of Pdca In Iso 50001?
Author: William Charles

7. Step-by-step Instructions On How To Generate Inventory Reports Quickbooks?
Author: Jack Edwards

8. How To Track Employee Work Hours Efficiently With Trackhr
Author: TrackHr App

9. From Grounded To Global: 4 Ceos Rewiring India’s Aviation Sky
Author: Skyone

10. The Role Of Automation In Modern Cloud Migration Methodology
Author: Netscribes

11. Master Photo Retouching | Steps To Become A Photo Editing Expert
Author: ukclippingpath

12. Great Dependability And Performance Are The Reasons For Extensive Use Of Hydro Pneumatic Press
Author: David Camp

13. Best Lasik Eye Surgery For A Spectacle-free Life
Author: Anil Eye Hospital

14. Industrial Oven Manufacturers In Coimbatore
Author: Heatcon Sensors

15. Plumbing In North Salt Lake: Your Guide To Reliable Services
Author: Brown Jones

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: