Leach Wallace Associates Inc Consulting Engineers On New Patient Tower, Sibley Memorial Hospital

By Author: Dennis L. Huffman
Total Articles: 5

It is the third phase of a three-phase project that includes a new medical office building and garage (phase 1), and a new Cancer Center (phase 2). This phase included the creation of a new front entrance and completed the major addition to what is now known as the “New Sibley”.

The new patient tower includes a new emergency department, new inpatient pharmacy and connecting bridge to the existing tower building. The inpatient tower provides 263 new all private rooms including shell space for a 20 bed expansion. The initial fit out consisted of a 20 bed LDR unit, sized for 4,000 annual births, with three new “c-section” rooms, a 20 bay special care nursery and a 50 bed post-partum support component.

A new 25 bed telemetry/IMC unit is located adjacent to a new 25 bed orthopedic unit. The remaining beds are for medical/surgical patients. A new and expanded emergency department, sized for 45-50,000 visits, provides new treatment bays including a new fast-track area and new waiting areas. A new single story entry pavilion acts as the new main entry and lobby space for the project. Minor renovation work was performed in the existing hospital to allow for the connection at several of the lower floors.

The project includes a chilled water plant that is expandable for future use as the sole chilled water plant; heating hot water boilers; domestic water plant; medical gas systems; custom air handling units; emergency generator plant; and normal and emergency power distribution that serves the new addition. In addition, this project provides the generator plant for the campus, which will be housed on the roof. The project included an expanded emergency department in addition to the inpatient beds.

Leach Wallace is utilizing Revit as our BIM software for this project. This project has been designed as a LEED® certified facility. Design is complete and bidding is due to begin in early 2013. Construction is scheduled to be completed by the end of 2015.

Total Views: 70Word Count: 325See All articles From Author

Service Articles

1. Understanding The Concept Of Construction Staking & Site Layout
Author: liam well

2. Mitsubishi Hmi Got 1000 Series Traders In Chennai | Mitsubishi Electric Suppliers In Chennai | Dta
Author: Tharakeswari C

3. Find The Fastest Connection For Home Or Office With Wireless Technology
Author: James

4. Get Effective Wifi Connection For Your Conference
Author: James

5. Accounting Software | Erp Software – Tally Erp 9
Author: Al Manal Technology

6. Haitu Engineers Business Of Manufacturing Metal Furniture In Mild And Stainless Steel In Pune
Author: Haitu Engineers

7. Features And Functions Of Tally Erp 9
Author: Al Manal Technology

8. 5 Key Features Of Woocommerce To Consider For Ecommerce Development
Author: Jonathan Paul

9. Drupal: The Best-in-class Platform To Build High-end Web Applications
Author: Jonathan Paul

10. Unraveling The Story: What’s New To Know About Magento 2
Author: Jonathan Paul

11. How To Avoid Drywall Damages
Author: Michael Smith

12. Arbitration: Documentary Evidence To Figure Out Damages
Author: Liam Well

13. Choose The Best Hotel In Kathmandu According To Your Budget
Author: hotelrosemary

14. Why You Require Mep Coordination Services For Your Construction Projects?
Author: nibt

15. Erp Accounting Software For Business Enterprises
Author: Al Manal Technology

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: